Power
The new economy is a power bill.
AI compute, data centers, and electrification do not replace energy. They concentrate it.
A model, a training run, a warehouse of servers, a fleet of cars on the same feeder: each one is load. Demand of that kind compounds. The plant, the transformer, and the interconnection do not. Years sit between a signed load letter and electrons that show up.
Pathwise treats power as its own book inside the energy conviction. The question is which prices already know about the load, and which are still priced for a grid that was built for something smaller.
That is a modeling problem, not a theme. A chart of data-center announcements is not a position. The position exists when a model earns it.
See also energy and digital assets, or the research index.